- Design of connection installation 20 kV voltage from another source, 110/20 kV substation for a better continuity in energy supplying;
- A new 20 kV connection with underground cables from ELECTRICA Distribution 110/20 kV Substation;
- Design of a new medium voltage 20 kV substation with the latest 20 kV equipments;
- Increase the safety in energy supplying of the Airport by mounting new modern and efficient equipments;
- Ensure the maximum continuity in energy supplying for the Airport in any condition by making this new electrical line from a different source.
Total investment costs - 1.180.000 USD